Getting Ready for 2019
Today the new equipment shed was fitted and looks good.
Will make it easier to get rinks ready for matches by having the equipment on hand.
Also the two new memorial benches have been fitted at south end of green and are in process of being oiled. We have moved two benches to the road side of green and all benches have been painted.
All benches have been bolted down.